Recently our President Mr. Wu Pin Fang has signed a contract for the development of an entire LNG chain in Uzbekistan and the gasification of the area. In the first phase, it involves the construction of a Liquefaction Plant of 288 MTD (374Nm3 / d), 7 Regasification Satellite Plants, 10 LNG tankers and the conversion of between 1500 and 2000 truck with diesel engines to LNG.
The LNG plant will use the PC-MR system, which is the system most recommended by FURUISE, although FURUISE has also installed plants with the “N2 expander” system. The PC-MR system offers greater efficiency and greater productivity; it is more flexible in the composition of the intake gas; requires less number of rotating equipment and its modular-compact type design is preferably. On the contrary, it must be taken into account that the refrigerant requires more care in its handling and use.